Since our last post we've been making good progress in several directions.  Shortly after that post we got lights installed in the great room We were able to take down the scaffolding over our stairs.  Our living room feels huge again!


We got the sprinkler inspection.  That was the first "final" inspection to close out our permit.  That was a huge milestone.  

We've moved on to the floor.  Bamboo tongue and groove.


It's turning out really nicely.  To make the stairs work out we needed to paint our way out from the top of the stairs.  The TV area came first then we moved to the other side and are partway through the master bedroom now.  It looks beautiful and feels so good on bare feet.  Our cats are grumpy because they can't dig their claws into the floor to run around the house.  It also means we move a bunch of furniture install some floor (with some stinky glue and lots of loud nailing), then move all the furniture back.  It's a lot of change.  They miss the rough framed walls that they could walk through.