Regular status updates of on the progress of our remodel. Our goal is to turn a 1950s era home into an energy efficient, attractive home suitable for the next generation.
Monday, March 2, 2020
Front door progress
Since wrapping the master bathroom counter prep and the kitchen window trim we moved onto prep to actually getting the real front door installed. The framing contractor that we hired did not frame the rough opening to a size that matches any available door so I started framing in the opening a bit to fit the door we decided on. We ordered the door on Saturday and hopefully will have it arrive around when we are ready to install it. Once the door is in and trimmed we can move forward with the final bits of the front of the house. It will do a lot to help the curb appeal and we are looking forward to having that step done.