Around September we set a goal of getting sheetrock up in the February or March. There was still a lot to do and we did not really know how we were going to make it happen. In that time we have dealt with a lot: extra framing; mechanical details; foundation repairs; drainage repairs; and probably a number of things I am forgetting. Somehow we basically hit our goal and are in the process of getting the house sheetrocked. Everything is hung downstairs. Taping and mudding is in the process downstairs. The upstairs probably has 1-2 days left before all the sheetrock is hung. Getting here has been a marathon and there is a lot left to do, but this is a major milestone.
 |