It has been a while since we did electrical work, but this weekend was filled with it. We got a electrical car charging plug setup for the front yard on Saturday. Sunday afternoon involved wrapping up most of the storage area panel. Wiring a panel is probably a lot faster for a professional, but takes a lot of time for me. There are a few circuits left, but everything that needs to be done before sheetrock is put up is now. We also got a lot of the storage area ceiling sheetrock hung and some other miscellaneous tasks over the last few weeks.
 |
A 50 amp 220 volt GFCI circuit for electric car charging |
 |
The storage area panel is nearly done |
wired.