Sunday, June 11, 2017

Odds and Ends

This weekend was filled with a bunch of odds and ends. We got some sheetrock hung. We got the phone and cable conduit wrapped up. We also re-installed the phone box on the back of the house for the DSL line to be installed on Tuesday. Bye bye Comcast! Most of the work was focused on wrapping up the work needed in our storage area before the final inspection. That will allow us to clear out the rest of the house to facilitate sheetrock.

Phone and Cable Conduit

Added the Phone Box

Sunday, June 4, 2017

A Weekend of Electrical and Other Work

It has been a while since we did electrical work, but this weekend was filled with it. We got a electrical car charging plug setup for the front yard on Saturday. Sunday afternoon involved wrapping up most of the storage area panel. Wiring a panel is probably a lot faster for a professional, but takes a lot of time for me. There are a few circuits left, but everything that needs to be done before sheetrock is put up is now. We also got a lot of the storage area ceiling sheetrock hung and some other miscellaneous tasks over the last few weeks.

A 50 amp 220 volt GFCI circuit for electric car charging


The storage area panel is nearly done

wired.