We got some of the miscellaneous details in the attic dealt with. An electrical run that was exposed is now in a little box to keep the wire from being damaged. We also finished up the floor in the area that is tall enough to use for storage. Hopefully this will give us some storage while we are dealing with sheet rock. The floor also makes it a lot safer for some of the mechanical work that needs to be completed in the attic.
 |
Electrical is protected |
 |
Attic floor |