Regular status updates of on the progress of our remodel. Our goal is to turn a 1950s era home into an energy efficient, attractive home suitable for the next generation.
Sunday, June 19, 2016
We got some of the miscellaneous details in the attic dealt with. An electrical run that was exposed is now in a little box to keep the wire from being damaged. We also finished up the floor in the area that is tall enough to use for storage. Hopefully this will give us some storage while we are dealing with sheet rock. The floor also makes it a lot safer for some of the mechanical work that needs to be completed in the attic.
Subscribe to:
Posts (Atom)