The ledger is attached!
Regular status updates of on the progress of our remodel. Our goal is to turn a 1950s era home into an energy efficient, attractive home suitable for the next generation.
Saturday, December 31, 2016
Sunday, December 18, 2016
Front Ledger
We ordered 2 - 16' 2" X 10" for the ledger. Redwood Lumber delivered 2 - 20' 2" X 12" boards, and only charged us for what we ordered. The boards they substituted are heaver, but it should not be a problem for us. They've been great to work with!
![]() |
Shorter 2 Pieces of the Ledger |
Saturday, December 10, 2016
Floor insulation
Today was about floor insulation. Eventually we will be fine with insulation. It was surprising how quickly we went through what seemed like a huge amount of insulation. There are only two bags left and we will need to order more.
Monday, December 5, 2016
Oh My December is Here
![]() |
Outside |
![]() |
Inside |
Sunday, November 27, 2016
Finishing things up
This week we got a lot done, but it was in bits and pieces. Today is about finishing things. For me, this wall of insulation, and the "beltline" of denim insulation between the downstairs ceiling and upstairs floor.
Saturday, November 26, 2016
Sheetrock "Storage"
More deficiencies
left most of them only hand tight. This one was over 1" from being
tightened. The shiny threads are all below the nut position of the way it
was left. Needless to say it would not have served its purpose as it was
installed.
![]() |
Tightened Hold Down |
Thursday, November 24, 2016
Happy Thanksgiving
We hosted our second successful Thanksgiving in our house, and we didn't even blow a circuit this year. I'm thankful for a loving family that shares our vision for our house.
Wednesday, November 23, 2016
More deficiencies
Tuesday, November 22, 2016
Fixing deficiencies
Saturday, November 19, 2016
Stem walls
The garage stem walls are now cut back a little bit to be able to fit a standard size garage door. The door is on order and should come in soon.
Wednesday, November 2, 2016
Saturday, August 13, 2016
Sunday, July 31, 2016
Insulation innovation
Ian crafted an insulation cutting stand at the right height to lay the bat on the table and cut on the stand. When measuring it looks like a fabric store. Wisdom from his mom put to a surprising use.
We used deer net to keep the insulation up in the ceiling before the sheet rock will go in. I credit the net idea to Ian's stepmom who has it surrounding her gardens.
Sunday, July 24, 2016
And more insulation
We had hoped to insulate the garage this weekend. The insulation for the ceiling was out of stock, so when we finished the walls we kept on going. We got most of the 2x4 walls in the house. It was a good weekend.
We've decided that "stonewashed blue" is not going to be our paint color, but is a step up from "weathered wood".
Sunday, July 17, 2016
Insulation
This is one of the "green" elements of our project. Recycled denim insulation. Easier to work with than fiberglass, similar performance, and 80 recycled content.
And it feels like a big step forward!
Sunday, June 19, 2016
Sunday, May 29, 2016
Disconnect
Sunday, May 15, 2016
Let there be structure
The structure media panel is now installed. More sheetrock finish got done. A lot of electrical box prep also happened. All in the right direction.
Sunday, May 1, 2016
![]() |
Clear Story Windows |
![]() |
Behind the Fireplace |
![]() |
In the Laundry Room |
![]() |
The Low Voltage Junction Box Under The Stairs |
Sunday, April 24, 2016
More earthwork
![]() |
The side yard as of Saturday evening |
![]() |
The side yard as of Sunday evening |
![]() |
Repairing a water line for the front sprinklers |
![]() |
The front yard after backfilling the fixed and lowered water line |
Sunday, April 17, 2016
Dealing with the dirt pile
![]() |
What things looked like after wrapping up on Saturday |
![]() |
More progress was made on Sunday |
The drainage should work better for the rain that is expected on Friday.
Sunday, March 27, 2016
More conduit
The under porch and future car charger conduits are done. That completes everything for the garage panel required for sheetrock.
Saturday, March 26, 2016
Sunday, March 13, 2016
Ducts and Misc.
Sunday, March 6, 2016
Ducts! And attic electrical
Our projects for the weekend included getting ducts through our store room. 3 ducts: one for a bathroom fan, which Ian is wiring up as I type this, one for the drier vent and another for a ceiling fan in the laundry room. Ian also wired up outlets in the attic, and an exterior outlet on our roof (plug in point for Christmas lights?).