Sunday, March 15, 2015

Finally up to date

Yesterday morning, I painted what I could from the scaffolding.  If only I were a few inches taller I could have reached the peak!  Ian installed the vent for our downdraft hood.  In the afternoon, more work on the "Tesla Tube."  Ian drilled holes for the conduit, and I assisted and cleaned.  I am amazed at the volume of sawdust that is generated each and every week during this process.