The ledger is attached!
Regular status updates of on the progress of our remodel. Our goal is to turn a 1950s era home into an energy efficient, attractive home suitable for the next generation.
Saturday, December 31, 2016
Sunday, December 18, 2016
Front Ledger
This weekend consisted of waterproofing and putting up some of the ledger for the front porch. There was a planter in this area before that was oddly connect to the basement. We're reconfiguring it to be a porch. The area should not get wet, but even if it does it should be okay the way thing are setup now, and the basement should stay much drier.
We ordered 2 - 16' 2" X 10" for the ledger. Redwood Lumber delivered 2 - 20' 2" X 12" boards, and only charged us for what we ordered. The boards they substituted are heaver, but it should not be a problem for us. They've been great to work with!
We ordered 2 - 16' 2" X 10" for the ledger. Redwood Lumber delivered 2 - 20' 2" X 12" boards, and only charged us for what we ordered. The boards they substituted are heaver, but it should not be a problem for us. They've been great to work with!
![]() |
Shorter 2 Pieces of the Ledger |
Saturday, December 10, 2016
Floor insulation
Today was about floor insulation. Eventually we will be fine with insulation. It was surprising how quickly we went through what seemed like a huge amount of insulation. There are only two bags left and we will need to order more.
Monday, December 5, 2016
Oh My December is Here
It is December. The garage door is up and seals up the house much tighter than the plywood that used to be there. Also it helps a lot with the curb appeal. Insulation is moving along nicely. We cleared out an area where the ceiling will need to be insulated to facilitate insulation installation. Things keep moving forward.
![]() |