The disconnect is now wired for the air handler. We also got things setup for the zone controller. It does not look like much. However, it was a lot of little steps and feels really good to have done.
Regular status updates of on the progress of our remodel. Our goal is to turn a 1950s era home into an energy efficient, attractive home suitable for the next generation.
Sunday, May 29, 2016
Sunday, May 15, 2016
Let there be structure
The structure media panel is now installed. More sheetrock finish got done. A lot of electrical box prep also happened. All in the right direction.
Sunday, May 1, 2016
This weekend involved a lot of miscellaneous details. On Saturday I got the electronic openers for the clear story windows working. Now the windows will automatically open when it gets too hot and close when it gets cold. We were surprised how effective they were. They also helped equalize the temperature between upstairs and downstairs.
Cheryl spent both days working on applying tape and mud in two area where we need to get sheet rock done before the entire house gets dealt with.
I spent Sunday afternoon dealing with the low voltage conduit. I made a surprising amount of progress.
![]() |
Clear Story Windows |
![]() |
Behind the Fireplace |
![]() |
In the Laundry Room |
![]() |
The Low Voltage Junction Box Under The Stairs |