It was a full weekend. Saturday was conduit for low voltage wiring. Today I worked on great stuff. It looks like Cheetos but seals all gaps and cracks for fire safety and insulation. We also framed out a duct in the downstairs snack bar.
Regular status updates of on the progress of our remodel. Our goal is to turn a 1950s era home into an energy efficient, attractive home suitable for the next generation.
Sunday, January 31, 2016
Saturday, January 16, 2016
Saturday, January 9, 2016
Friday, January 1, 2016
Electrical panel
Ian installed breakers, and I made sure that the home runs had wire nuts so that there is no way we'll have an unintended live circuit.
Subscribe to:
Posts (Atom)