Sunday, January 31, 2016

Great stuff and framing

It was a full weekend.  Saturday was conduit for low voltage wiring.  Today I worked on great stuff.  It looks like Cheetos but seals all gaps and cracks for fire safety and insulation.  We also framed out a duct in the downstairs snack bar.

Saturday, January 9, 2016

Master bath fan duct connected

Lots of tape and sealant.  It should be air tight.  And strapping to keep it secure.

Friday, January 1, 2016

Electrical panel

Ian installed breakers, and I made sure that the home runs had wire nuts so that there is no way we'll have an unintended live circuit.