Regular status updates of on the progress of our remodel. Our goal is to turn a 1950s era home into an energy efficient, attractive home suitable for the next generation.
Thursday, January 29, 2015
Monday, January 26, 2015
Ceiling Electrical
Little boxes
The daffodils are starting to bloom, the picture shows them from the kitchen windows. Usually the deer eat them, guess they don't like the security light.
Monday, January 19, 2015
Bad board is fixed
Sunday, January 18, 2015
Prep for Living Room Lighting
Monday, January 12, 2015
Sunday, January 11, 2015
Building envelope
We did some little projects today around the house. We went to a kickoff for a resilient community program to teach us how to reduce our carbon footprint and prepare for likely problems associated with climate change. The talk stressed how important it was to seal the building envelope of your home. We'll eventually get to the level of detail that they were addressing. But for now we're working on the building envelope on a very basic level
Saturday, January 10, 2015
Sunday, January 4, 2015
Garage door?
We took our garage door down today. It can be very dangerous if you don't get the right tools and don't read the directions. The one-size-fits-all tools didn't fit, but we made do and the garage door is safely down. We joked that I love the plywood look on the front door so much, that I had to have it on the garage too.
We also finished sealing around our greywater pipe.
Saturday, January 3, 2015
Happy New Year
We were here on new years day. Lots of cleaning. A day of hard work with not much to show except a demoed sewer pipe and emptier garage. But today was great. The crew was here and put up most of the joists for our kitchen ceiling. Ian and I moved a water heater with some help from our carpenter. We did a little painting near our water heater and prepped to seal around the hole where our greywater goes through the slab. And patching the floor where the sewer pipe was. Lots of progress.